by Brett Drinkwater | Dec 17, 2018
Greenham’s Pallet Freezer Back to projects Industrial : Greenham’s Pallet Freezer Bacon Factory Road, Smithton TAS 7330 Greenham’s new 512 pallet freezer at their Smithton factory which was completed in November 2015 after a 6 month construction...
by CainOLazer | Dec 17, 2018
Fonterra Tanker Bay Back to projects Industrial : Fonterra Tanker Bay 86-92 Inglis St, Wynyard TAS 7325 The new milk receiving tanker bay had to be built in the shutdown period of the working cheese factory. An allowance in the construction time had to be made for the...
by CainOLazer | Dec 16, 2018
Debruyn Coolstore Back to projects Industrial : Debruyn Coolstore 8 River Rd, Wivenhoe TAS 7320 De Bruyn Cold Store at River Road, Wivenhoe which was completed in September 2013 after a 5 month construction time. The concrete slab required considerable quality control...