Current Projects

Below are a selection of current projects;

DoE - Parklands High School Redevelopment                                                                                                                         

Circular Head Council - Wellbeing Centre     

Zinfra - Burnie, Chapel Street, Liapootah, Palmerston, Norwood & Waddamana Substations                                                                                       


Industrial Projects

Below are a selection of recent industrial projects;

Project Image

Industrial : Debruyn Coolstore

8 River Rd, Wivenhoe TAS 7320

De Bruyn Cold Store at River Road, Wivenhoe which was completed in September 2013 after a 5 month construction time. The concrete slab required considerable quality control to ensure optimum levels to accommodate the automated forklift which stacks and removes the pallets. The building is used as a refrigerated cheese store.

View Detail

 
 
Project Image

Industrial : Fonterra Tanker Bay

86 - 92 Inglis Street, Wynyard TAS 7325

The new milk receiving tanker bay had to be built in the shutdown period of the working cheese factory. An allowance in the construction time had to be made for the new milk lines to be installed and tested by Fonterra prior to general operations being reinstated (extremely long and enduring process). Construction of the tanker bay required demolition of some of the existing structure, re-alignment of the driveway and new drains established in the new concrete driveways.

View Detail

 
 
Project Image

Industrial : Greenham's Pallet Freezer

Bacon Factory Road, Smithton TAS 7330

Greenham's new 512 pallet freezer at their Smithton factory which was completed in November 2015 after a 6 month construction time. Greenham's entered into a Design & Construct contract with Stubbs Constructions Pty Ltd for this project with the construction involving driven timber piles, concrete/blockwork footings, concrete slabs, steel structure with insulated wall panels.

View Detail


Civil Projects

Below are a selection of recent civil projects;

Project Image

Civil : TasRail Rail Yard Under Floor Lathe

25 - 31 Reeves Street, South Burnie TAS 7320

In 2017 Stubbs Constructions completed the construction of a steel portal frame workshop building and associated civil works to house a new under floor wheel lathe for on-track maintenance of rolling stock for TasRail at their South Burnie rail yard.

 

View Detail

Project Image

Civil : Burnie Aquatic Centre

Terrylands, Burnie TAS 7320

We have completed work on the construction and expansion of the $10 million Burnie Aquatic Centre.  This project will give the Burnie district a facility that will enhance and drive community health and wellbeing into the 21st century.

View Detail

Project Image

Civil : Burnie Waterfront

1/2 North Terrace, Burnie TAS 7320

The Burnie Waterfront $3.5 million redevelopment was a design and construct project that began in 2011 and was completed during January 2012.

View Detail

Project Image

Civil : Woolnorth

Woolnorth, TAS 7330

In 2002 Hydro Tasmania awarded Stubbs Constructions Pty. Ltd. the $6.6 million Woolnorth Wind Farm Stage 2 civil and electrical works.

View Detail


Commercial and Residential Projects

Below are a selection of recent commercial projects;

Project Image

Commercial : Department of State Growth, Internal Refurbishment

Harris Building, Burnie TAS 7320

Stubbs Constructions were engaged by the Department of State Growth to undertake a refurbishment of their Burnie Harris Building Office.

 

View Detail

Project Image

Commercial : SERS New Office, Workshop & Store

47-49 Strahan St, South Burnie TAS 7320

The $890,000 construction of the new SERS Office, Workshop and Store took five months to complete.  

 

View Detail

Project Image

Commercial : Burnie Surf Life Saving Club

1/2 North Terrace, Burnie TAS 7320

Burnie Surf Club Alterations and Additions was a $3 million project designed by Architect Scott Verdouw of JAWS Architects Hobart. Award Winner.

View Detail

Project Image

Residential : Avery Residence

512 Tollymore Road, Wynyard TAS 7325

Stubbs Constructions were engaged by owners Hugo & Donna Avery to construct a residence and farm shed on their farmland at Table Cape. Andrew Smith Architects designed the 380 m2 residence which took in the magnificent views looking west towards Boat Harbour.

 

View Detail

Project Image

Residential : Sebastian Court Units

Sebastian Court, Romaine TAS 7320

The $1.6 million construction of 6 double storey units on a moderately inclined block.

 

View Detail


Educational Projects

Below are a selection of recent educational projects;

Project Image

Educational  : Parklands High School

11 Atkins Drive, Romaine TAS 7320

On 10th October 2016, the Department of Education awarded Stubbs Constructions the redevelopment contract for Parklands High School. Completion of the initial contract final stages is expected mid October 2018; completing a nearly two-year scheduled works duration for Stubbs Constructions and their respective sub-contractors.

 

View Detail

Project Image

Educational  : School of Special Education Burnie

Thorne Street, Acton TAS 7320

The refurbishment of the old Acton Primary school includes eight large classroom spaces along with breakaway, individualised learning areas, sensory rooms, a dedicated library, music room, an accredited kitchen for special needs use and a large spa for hydrotherapy.

 

View Detail

Project Image

Educational  : The Circular Head Trade Training Centre

Montagu Road, Smithton TAS 7330

The Circular Head Trade Training Centre incorporates facilities for metalworkers, carpentry, plumbing and automotive trades. It is a spectacularly dynamic building nestled in an established and peaceful setting beside the Duck River in Smithton.

View Detail

Project Image

Educational : Romaine Park Primary School

Cnr Roslyn Ave and Mount Street, Romaine TAS 7320

Stubbs Constructions were the successful tenderer for this $12.7 million project comprising multiple buildings with varied footing designs including piles.

View Detail