  Job title :
Helyer Mine Clarifier Tank
 
     
 

This Project called for the construction of a 20.0 m diameter cast in-situ concrete tank. The tank had an overall height of 6.0 m.

In order to complete the tank to the specified shape and finish, Stubbs Constructions Pty. Ltd. designed and manufactured project specific formwork. This formwork was utilised for 6 No. individual pours to ensure that all Project requirements were met.

Due to the material to be processed in the tank, stringent quality benchmarks were set by the Client. With all of these requirements fully achieved, the tank was completed on time, and within budget.

Working in the mining environment, Stubbs Constructions Pty. Ltd. adopted rigorous procedures to ensure all work was in accordance with the site requirements.

 

 
     
© Copyright 2004, STUBBS CONSTRUCTIONS PTY LTD.
 
     
Home Page | Contact us | Privacy Statment | Construction | Projects | Resources | Management | History
Stubbs Constructions Pty Ltd - 15 River Road, Wivenhoe, TAS 7320,
PO Box 573, Burnie TAS 7320.
Phone: (03) 6431 3306 / Fax: (03) 6431 6238